Skip to content

In BGMU’s service territory, there are four water pressure zones that are regulated by five system water tanks. There are 5,410 manholes, 5,858 system valves, and 59 sewer pump stations throughout our system. The largest water pipe size in our system is 60 inches, and the largest wastewater pipe size is 48 inches.

 

Search